Projects

Food and Beverage

Client

Frylite, Strabane, Co. Tyrone

Project

Factory Fit-Out

Project Complete

ERM completed a complex mechanical project at the above location for Frylite

Key Features

The offices works included the following:

  • Installation of new gas fired heating system inclusive gas fired system boiler, radiators etc.
  • Installation of new domestic plumbing system inclusive of pressurised cylinder, sanitary ware & wastes
  • Installation of new automatic controls for offices
  • Installation of new air conditioning system to new offices

The New Factory works included the following:

  • Installation of new process compressed air system for pneumatic valves for operating equipment
  • Installation of new steam plant room which provided steam to process equipment and to tank farms
  • Distribution of oil lines from process equipment to tank farms
  • Installation of steam tracing to stop liquid from solidifying
  • Installation of ventilation from process equipment.
  • Installation of high pressure pipe work to steam washers
  • Installation of new steam & condensate system to factory floor
  • Installation of automatic controls
Construction Online
SNIPEF
ISO 9001
ISO 14001
ISO 45001